5-11.
Main Board Assembly
Note
The eject lever for SxS card must be retracted for the work in this section.
Preparation
1.
Remove the top panel. (Refer to
2.
Remove the front panel assembly. (Refer to
3.
Remove the front chassis assembly. (Refer
Removal
1.
Remove the four screws.
PSW3 x 6
2.
Remove the screw (BTP3 x 8), the screw (B3 x 4), and the two screws (B2.6 x 5).
PMW-PZ1
"5-2. Top
Panel")
"5-3. Front Panel
to"5-9. Front Chassis
B3 x 4
BTP3 x 8
Assembly")
Assembly")
Location of the screws
B2.6 x 5
5-19