C300 Controller Operation; C300 Controller Start Up - Honeywell Experion C300 User Manual

Hide thumbs Also See for Experion C300:
Table of Contents

Advertisement

This section includes information about operating and monitoring the controller. The
following topics are presented here. Click on the topic to view it.

C300 Controller start up

Initiating a controller Shutdown
C300 faceplate indicators/displays
FTE activity LEDs
Control Builder block icon descriptions
Activate the C300 Controller CEE
Initiating Synchronization command
Disable Synchronization command
Initiating Become Primary command
Initiating Switchover command
Interacting through Station displays
Viewing controller operation and status using Monitor tab
C300 operating behaviors
C300 Controller overload behavior
C300 Controller start up
The C300 Controller module executes a series of tasks automatically when power is
applied to the controller module. These tasks include:
Power-On Self Test (POST) to verify the presence and integrity of the controller
module hardware.
Initialization of the hardware and software environment
Determination of whether to transition to the application image, if present.
R301.1
11/06

C300 Controller Operation

Experion C300 Controller User's Guide
Honeywell
Topic
157

Advertisement

Table of Contents
loading

Table of Contents