Chapter 4
Perform Node Acceptance Tests
Step 5
Return to your originating procedure (NTP).

DLP-G89 Verify OADM Node Pass-Through Channel Connections

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Identify the first band connection configured in pass-through mode in both directions.
Step 1
Step 2
Tune the tunable laser to the wavelength of the band to be tested.
Step 3
Complete the
the first pass-through connection.
(Optional.) Complete one of the following:
Step 4
Complete Steps
Step 5
Test the pass-through channel connections:
Step 6
Step 7
Tune the tunable laser on a wavelength (1 of 4) belonging to the channel to be tested.
Step 8
Complete the
first pass-through connection.
(Optional.) Complete one of the following:
Step 9
If the pass-through connections use a 4-channel multiplexer/demultiplexer (4MD-xx.x), continue with
Step 10
Step
Identify the first channel connection that is configured in pass-through mode using the 4MD-xx.x cards
Step 11
in both directions.
Tune the tunable laser on the corresponding wavelength.
Step 12
Step 13
Complete the
September 2004
This task verifies the pass-through channel connections during an OADM
node acceptance test.
None
DLP-G46 Log into CTC, page 2-25
As needed
Onsite or remote
Superuser only
"DLP-G90 Verify an AD-xB-xx.x Pass-Through Connection Power" task on page 4-30
If OSCM cards are installed, connect a power meter to the east OPT-BST LINE TX port and verify
that the east amplifier is turned on by the pass-through wavelength.
If OSC-CSM cards are installed, complete the
task on page 4-25
for the east OSC-CSM card.
2
through
4
for all band connections configured in pass-through mode in both directions.
If the pass-through channel connections use an AD-xC-xx.x card, continue with
If pass-through channel connections use a 4MD-xx.x card, continue with
"DLP-G91 Verify an AD-xC-xx.x Pass-Through Connection" task on page 4-31
If an OSCM card is installed, connect a power meter to LINE TX port on the front-pane and verify
that the east OPT-BST amplifier is turned on by the pass-through wavelength.
If an OSC-CSM card is installed, complete the
task on page 4-25
for the east OSC-CSM card.
11. If not, continue with
"DLP-G92 Verify an 4MD-xx.x Pass-Through Connection Power" task on page
DLP-G89 Verify OADM Node Pass-Through Channel Connections
"DLP-G84 Verify the OSC-CSM Incoming Power"
"DLP-G84 Verify the OSC-CSM Incoming Power"
Step
15.
Cisco ONS 15454 DWDM Installation and Operations Guide, R4.7
for
Step
7.
Step
11.
for the
4-32.
4-29