Figure 8-7 Site Controller - Captive Screws - Motorola DIMETRA MTS 2 Installation, Configuration And Basic Service Manual

Hide thumbs Also See for DIMETRA MTS 2:
Table of Contents

Advertisement

Checking and Replacing Site Controller Lithium Battery
Procedure 8-3 How to Replace Site Controller Lithium Battery (Continued)
3
4
5
6
7
8-16
Shock Hazard. The MTS contains dangerous voltages which can
cause electrical shock or damage to equipment. Turn off the MTS and
remove the power cabling before servicing this equipment. Make sure
all power is off to prevent accidental contact with high energy and
injury to personnel.
Wear an ESD strap and connect its cable to a verified good ground. This strap must be worn
to prevent ESD damage to any components.
Tag and disconnect any cabling from the Site Controller.
Loosen the two M4X10 captive screws securing the Site Controller to the chassis.

Figure 8-7 Site Controller - Captive Screws

Use the handle, and gently slide the Site Controller from the slot, removing it from the chassis.
There are cables connected at the rear of the Site Controller. Slide out the Site
Controller carefully, tag and disconnect ribbon cables at the rear.
Remove the Site Controller cover. Unscrew 19 screws securing the cover and slide it off gently
to avoid damage to components installed on the board (the cover can harm the springs on the
RJ-45 connectors (front side connectors), when the cover has been slid nearly completely off).
Chapter 8: Site Controller
6802800U74-N September 2009

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dimetra mts 4

Table of Contents