Installing The Battery In The Extinguishant Control Panel - Huawei LUNA2000-2.0MWH Series User Manual

Smart string ess
Hide thumbs Also See for LUNA2000-2.0MWH Series:
Table of Contents

Advertisement

LUNA2000-2.0MWH Series Smart String ESS
User Manual
Figure 4-13 Installation process diagram
----End

4.3.3 Installing the Battery in the Extinguishant Control Panel

Prerequisites
● The extinguishant control panel has been configured and commissioned before
● Non-professional personnel are prohibited from operating the Write Enabler
● In an outdoor scenario, you are advised to power on the extinguishant control
Issue 08 (2022-11-15)
NO TICE
delivery. Non-professional personnel are prohibited from configuring the
extinguishant control panel without permission.
button.
panel within 24 hours after unpacking. Otherwise, place it in a dry indoor
environment without corrosive gas.
If a battery is damaged, contact your local office.
Determine the position of the Extinguishant Control Panel.
Copyright © Huawei Technologies Co., Ltd.
4 Installation
109

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents