Huawei LUNA2000-2.0MWH Series User Manual page 146

Smart string ess
Hide thumbs Also See for LUNA2000-2.0MWH Series:
Table of Contents

Advertisement

LUNA2000-2.0MWH Series Smart String ESS
User Manual
Figure 5-35 Optical cable positions at the bottom
(1) DC power cable hole
(3) Optical cable or FE communications cable
hole
Figure 5-36 Connecting optical cables
Step 9 Check that the cables are connected correctly and securely. Then reinstall the
optical cable fastener and external mechanical parts.
Step 10 Install the removed cover.
Issue 08 (2022-11-15)
Copyright © Huawei Technologies Co., Ltd.
(2) AC input power cable or ground cable hole
(4) UPS or RS485 cable hole (reserved)
5 Installing Cables
136

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents