LUNA2000-2.0MWH Series Smart String ESS
User Manual
Figure 5-1 Before installing the socket
(1) Cable binding position
Step 1 Select a 110 V or 220 V socket as required.
Step 2 Connect the live wire and neutral wire.
Issue 08 (2022-11-15)
Installing a 110 V socket
a.
Connect the live wire and neutral wire from the mains to positions 1 and
2 of the XT9 terminal block.
Figure 5-2 Connecting the live wire and neutral wire from the mains
(1) 110 V/220 V socket installing position
b.
Install the 110 V switch.
c.
Connect the live wire (corresponding to cable 2056) and neutral wire
(corresponding to cable 1755) from the upper end of the switch to
positions 1 and 2 of the XT9 terminal block. Connect the live wire
(corresponding to cable 1751) and neutral wire (corresponding to cable
1752) from the lower end of the switch to the socket.
Copyright © Huawei Technologies Co., Ltd.
5 Installing Cables
114