3.3.2 Installing a Battery Pack

3.3.2.1 Method 1: Rack Mounting

Context
1.
Issue 01 (2021-12-23)
The standard UPS2000-G-6 kVA/10 kVA is typically configured with one
battery pack. The long backup time UPS is configured with at least two
battery packs. A maximum of four battery packs can be configured for a
standard or long backup time UPS. If more than one battery pack is
connected to the 6 kVA/10 kVA long backup time UPS, connect the battery
packs in parallel and then connect them to the UPS battery input ports, as
shown in the following figure.
Copyright © Huawei Digital Power Technologies Co., Ltd.
3 Installation
(c) Cable bridge