Download Print this page

GE ArcamEBM Spectra H Operation Manual page 42

Hide thumbs Also See for ArcamEBM Spectra H:

Advertisement

38
C C h h a a m m b b e e r r d d o o o o r r
Access to the build unit. The access doors that are se-
cured with screws and do not have interlock safety
switches
C C o o l l u u m m n n h h a a t t c c h h
Access to the Electron beam column.
C C a a u u t t i i o o n n
The column hatch lifting mechanism is sup-
ported by a gas spring which makes it easy to
lift. However, the hatch needs to be pushed
fully open to get the gas spring to hold the
hatch in an open position.
Make sure that the hatch is in the fully open
(top) position before commencing any work
within the EB Column compartment. When
closing the hatch, it should be supported by
hand.
C C o o n n t t r r o o l l c c a a b b i i n n e e t t d d o o o o r r
Access to the emergency stop reset, the computer and
the electronic racks.
C C o o o o l l i i n n g g s s y y s s t t e e m m a a c c c c e e s s s s p p a a n n e e l l
Panel secured with screws. Access to internal cooling
system.
02
OM-710430
en-GB

Advertisement

loading