Download Print this page

GE ArcamEBM Spectra H Operation Manual page 137

Hide thumbs Also See for ArcamEBM Spectra H:

Advertisement

7 7 . . 1 1 . . 3 3 . . 1 1 2 2 C C a a l l i i b b r r a a t t i i o o n n
The tools for calibration are gathered on the calibration page.
B B u u i i l l d d E E n n v v e e l l o o p p e e
Select and edit the build envelope
S S e e l l e e c c t t C C a a l l i i b b r r a a t t i i o o n n P P l l a a t t e e A A r r t t i i c c l l e e
A A u u t t o o B B e e a a m m C C a a l l i i b b r r a a t t i i o o n n
Used for Automatic Beam Calibration. This function requires a xQam beam
calibration plate.
R R a a k k e e C C a a l l i i b b r r a a t t i i o o n n
Used for calibration of the different rake positions. Please refer to the Instal-
lation Manual and Maintenance Instructions for detailed information on how
to perform a rake calibration.
T T a a b b l l e e C C a a l l i i b b r r a a t t i i o o n n
Used for calibration of the two positions of the build table (top and bottom
position).
A A l l a a r r m m L L a a m m p p T T e e s s t t
The alarm tower on top of the control cabinet indicates the current status of
the system with both light and sound.
Test that both sound and lights are working.
02
OM-710430
en-GB
133

Advertisement

loading