Download Print this page

GE ArcamEBM Spectra H Operation Manual page 104

Hide thumbs Also See for ArcamEBM Spectra H:

Advertisement

7 7 . . 1 1 . . 3 3 . . 2 2 O O v v e e r r v v i i e e w w W W i i n n d d o o w w
B B u u i i l l d d n n a a m m e e
S S e e r r i i a a l l
P P o o w w d d e e r r b b a a t t c c h h
T T o o t t a a l l B B u u i i l l d d H H e e i i g g h h t t
C C u u r r r r e e n n t t Z Z
M M a a x x L L a a y y e e r r T T i i m m e e
L L a a s s t t L L a a y y e e r r T T i i m m e e
A A p p p p r r o o x x i i m m a a t t e e d d B B u u i i l l d d
D D o o n n e e
A A p p p p r r o o x x i i m m a a t t e e d d T T i i m m e e L L e e f f t t
B B u u i i l l d d T T i i m m e e : : S S t t a a r r t t p p u u m m p p s s
t t o o c c o o o o l l i i n n g g d d o o n n e e
B B u u i i l l d d T T i i m m e e : : H H e e a a t t t t o o b b u u i i l l d d
d d o o n n e e
100
The content of the larger window will change de-
pending on what is selected using the menu button.
To return to the overview window, the Overview
button is pressed.
Displays the name of the loaded build.
Shows the serial number of the build. This is used in the naming of the
process log files. The build serial number is generated automatically: Ma-
chineName_Date_Time. It is also possible to enter a serial number
manually.
Displays the number of the powder batch. The powder batch number is a
static parameter. The last entered name/number will be displayed auto-
matically. Always update with the new batch number when changing the
powder batch.
Displays the total height of the build.
Displays the current height of the build.
Displays the longest layer time, in seconds, so far in the build.
Displays the time for last layer in seconds (including moving table, rake,
melting and LayerQam images).
Displays the date and time the build is expected to be completed.
Displays the estimated time left until build is completed.
Displays the time for the entire build, from when the pumps start until the
build is cool enough, to be safe for it to open the chamber door.
Displays the estimated time for the entire build, from heating of the start
plate until the build is completed.
02
OM-710430
en-GB

Advertisement

loading