Step 3 Reset the ASD.
1.
2.
3.
4.
5.
Step 4 Release smoke in the protected area using the smoke pistol. Verify that the ASD
alarm indicator lights up, and that an alarm is generated in the management
system.
----End

4.7 (Optional) NetEco Management

4.7.1 Preparations and WebUI Login

Prerequisites
Procedure
Step 1 Connect a network cable between the PC network port and the WAN1 port
(protected by a security mechanism) on the ECC800-Pro.
Table 4-5 Default IP addresses for the WAN and LAN ports on the ECC800-Pro
Port
WAN1
WAN2
LAN1 and LAN2
Issue 02 (2022-12-15)
Rotate the knob switch Mode to position 0.
Press the Set/Res button to start the reset.
Wait until the two airflow LEDs in the middle turn on.
Rotate the knob switch Mode to position 1.
Press the Set/Res button to finish the reset.
NO TE
After the operation is complete, press the reset button to reset the ASD
Supported operating system: Windows 7 and later versions
It is recommended that the screen resolution be 1366 x 768 or higher.
Browser: Chrome, Firefox 32, Internet Explorer 11 or later
Copyright © Huawei Digital Power Technologies Co., Ltd.
Default IP Address
192.168.8.10
192.168.0.10
192.168.248.10 (FusionModule500/800)
192.168.248.10
4 Commissioning Core Devices
50

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c00

Table of Contents