Commissioning The Emergency Light (Standard) - Huawei FusionDC1000A Commissioning Manual

Prefabricated all-in-one data center
Hide thumbs Also See for FusionDC1000A:
Table of Contents

Advertisement

FusionDC1000A Prefabricated All-in-One Data
Center
Commissioning Guide (IT Scenario)
Procedure
Step 1 Switch on the input power circuit breaker of the fire alarm control panel for the
protected area by referring to the power supply and distribution system diagram.
Step 2 Switch on the active and standby power supplies to power on the fire alarm
control panel.
Figure 4-3 Positions of power switches
Step 3 Unlock the keyboard.
The keyboard is locked to prevent misoperation.
Step 4 Set the time displayed on the fire alarm control panel.
Choose System Setting > Time Setting, enter the correct date and time, and click
OK. The system saves the time you have set.
----End

4.5.2 Commissioning the Emergency Light (Standard)

Issue 02 (2022-12-15)
NO TE
For the diagrams, see the initial configuration parameter manual for the solution in use.
NO TE
If the power indicator is on and other indicators are off, the power-on process succeeds. If a
yellow fault indicator is on, rectify the fault before continuing follow-up operations.
To unlock the keyboard, press Keyboard and then enter the password (the
initial password is 111111).
To lock the keyboard, press Keyboard when the keyboard is unlocked.
The keyboard will be locked if no operation is performed within 5 minutes.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Commissioning Core Devices
46

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c00

Table of Contents