Changing The Oil In The Rear Axle; Checking The Lubricant In The Gear Box Of The Rear Axle; Adjusting The Traction Drive For Neutral - Toro Reelmaster 03781 Operator's Manual

7000-d 4-wheel drive traction unit
Hide thumbs Also See for Reelmaster 03781:
Table of Contents

Advertisement

Changing the Oil in the Rear
Axle
Service Interval: After the first 200 hours
Every 800 hours
1. Park the machine on a level surface, lower the cutting
units, engage the parking brake, shut off the engine,
and remove the key.
2. Clean the area around the 3 drain plugs, 1 on each end
and 1 in the center
Figure 70
1. Drain plugs
3. Remove the oil-level-check plugs and the main axle
vent cap to ease in draining of the oil.
4. Remove the drain plugs and allow the oil to drain into
the pans.
5. Install the plugs.
6. Remove a check plug and fill the axle with
approximately 2.37 L (80 fl oz) of 85W-140 gear lube
or until the oil is up to the bottom of the hole.
7. Install the check plug.
Checking the Lubricant in the
Gear Box of the Rear Axle
Service Interval: Every 400 hours
The gear box is filled with SAE 85W-140 gear lube. Check
the oil level before the engine is first started and every 400
hours thereafter. The capacity is 0.5 L (16 fl oz). Visually
inspect for leaks daily.
1. Park the machine on a level surface, lower the cutting
units, engage the parking brake, shut off the engine,
and remove the key.
2. Remove the check/fill plug from the left side of the
gear box
(Figure
71) and make sure that lubricant is
up to the bottom of the hole. If the level is low, add
enough lubricant to bring the level up to the bottom
of the hole.
(Figure
70).
1. Gear box
Adjusting the Traction Drive
for Neutral
g009717
The machine must not creep when the traction pedal is
released. If it does creep, an adjustment is required.
1. Park the machine on a level surface, shut off the engine,
position the speed control into the low range, and
lower the cutting units.
2. Press only the right brake pedal and engage the parking
brake.
3. Jack up the left side of the machine until the left front
tire is off the shop floor. Support the machine with
jack stands to prevent it from falling accidentally.
4. Start the engine and allow it run at low idle.
5. Adjust the jam nuts on the pump rod end to move the
pump control tube forward to eliminate forward creep
or rearward to eliminate rearward creep
1. Pump-rod jam nuts
6. After the wheel rotation ceases, tighten the jam nuts
to secure the adjustment.
7. Shut off the engine and release the right brake.
52
Figure 71
2. Check/fill plug
(Figure
Figure 72
2. Pump control tube
g011488
72).
g009987

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reelmaster 7000-d03781

Table of Contents