Section 9
Establishing connection and verifying the IEEE C37.118/1344 communication
IEC140000144 V1 EN-US
Figure 16:
Captured synchrophasor data
9.5.2

Verifying the IEEE C37.118/1344 UDP communication

After setting both PMU configuration and the UDP client configuration (As explained in sections
the PMU station communication (PMU
configuration)
communication is set up, click Connect on the PMU Connection Tester tool.
IEC140000145 V1 EN-US
Figure 17:
Now it should be possible to see the streaming synchrophasor data.
Verify the communication by following the same steps as in section
TCP
72
and
Setting the TCP/UDP client
Verifying the UDP communication using PMU Connection Tester
communication.
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Report),
Setting the PMU station communication (PMU
communication) and making sure that the Ethernet
1MRK 511 403-UUS Rev. K
GUID-F0D1117D-3D0F-498F-A00C-242763F8A4E6 v1
IEC140000145-1-en.vsd
Verifying the IEEE C37.118/1344
Bay control REC670
Commissioning manual
Setting