Completing the test

Continue to test another function or end the test by navigating to Main menu/Test/IED test mode/
TESTMODE: 1 and change the IEDTestMode setting to Off. Restore connections and settings to their
original values, if they were changed for testing purposes.
11.5

Voltage protection

11.5.1

Two step undervoltage protection UV2PTUV (27)

Prepare the IED for verification of settings as outlined in section
for test"
in this chapter.
11.5.1.1

Verifying the settings

Verification of pickup value and time delay to trip for Step 1
1.
Check that the IED settings are appropriate, especially the PICKUP value, the definite time delay
and the 1 out of 3 operation mode.
2.
Supply the IED with three-phase voltages at their rated values.
3.
Slowly decrease the voltage in one of the phases, until the PICKUP signal appears.
4.
Note the trip value and compare it with the set value.
For phase-to-ground measurement:
Vpickup
ANSIEQUATION2430 V1 EN-US
For phase-to-phase measurement:
Vpickup
ANSIEQUATION2431 V1 EN-US
5.
Increase the measured voltage to rated load conditions.
6.
Check that the PICKUP signal resets.
7.
Instantaneously decrease the voltage in one phase to a value about 20% lower than the measured
trip value.
8.
Measure the time delay for the TRIP signal, and compare it with the set value.
9.
Check the inverse time delay by injecting a voltage corresponding to 0.8 × Vpickup<.
Bay control REC670
Commissioning manual
The dead time between two set injection pulses of 100ms is less than the set
tReset time, otherwise the function does not operate.
The trip value in secondary volts is calculated according to the following equations:
<
VBase
VT
sec
´
´
100
VTprim
3
<
VT
sec
´
´
VBase
100
VTprim
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Testing functionality by secondary injection
GUID-FEA7B2D1-3F4A-43FD-98F8-EC3584E5B511 v1
"Requirements"
and section
Section 11
SEMOD53540-1 v1
M13796-2 v6
"Preparing
M13796-9 v3
M13796-29 v11
(Equation 20)
(Equation 21)
127

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents