ABB Relion 670 Series Commissioning Manual page 138

Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

Section 11
Testing functionality by secondary injection
ANSI07000106 V2 EN-US
Figure 27:
where:
1
2
3.
Decrease slowly the voltage in phase VA of the test set until the PICKUP signal resets.
4.
Check V1 blocking level by comparing the voltage level at reset with the set undervoltage blocking
V1Low.
5.
Repeat steps
Check of V2Low
Procedure
1.
Connect voltages to the IED according to valid connection diagram and figure 28.
132
VA
VB
VC
VN
Connection of the test set to the IED for test of V1 block level
is three-phase voltage group1 (V1)
is three-phase voltage group2 (V2)
2
to
4
to check V1Low for the other phases.
The connections to V1 must be shifted to test another phase. (VA to VB, VB to VC,
VC to VA)
© 2017 - 2021 Hitachi Power Grids. All rights reserved
VA
VB
1
VC
VN
VA
2
VB
VC
ANSI07000106-1-en.vsd
1MRK 511 403-UUS Rev. K
SEMOD175258-91 v3
Bay control REC670
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents