Testing the voltage selection for double breaker
This test should verify that correct voltage is selected for the measurement in the SESRSYN function
used for a diameter in a Breaker-and-a-half arrangement. Apply a single-phase voltage of 100%
GblBaseSelLine to the V-Line and a single-phase voltage of 100% GblBaseSelBus to the V-Bus. Verify
that correct output signals are generated.
1.
Connect the analog signals to the voltage inputs, in pair of two for V1 and V2. (Inputs V3PB1,
V3PB2, V3PL1, V3PL2)
2.
Activate the binary signals according to the used alternative. Verify the measuring voltage on the
synchronizing check function SESRSYN (25). Normally it can be good to verify synchronizing check
with the same voltages and phase angles on both voltages. The voltages should be verified to be
available when selected and not available when another input is activated so connect only one
voltage transformer reference at each time.
3.
Record the voltage selection tests in a matrix table showing read values and AUTOSYOK/
MANSYOK signals to document the test performed.
Testing the voltage selection for 1 1/2 CB arrangements
At test of the SESRSYN (25) function for a breaker-and-a-half diameter the following alternative voltage
inputs can be used for the three SESRSYN (SESRSYN 1, SESRSYN 2, SESRSYN 3) functions. These
three SESRSYN functions can either be in one, two or three different IEDs. Table
scenario when SESRSYN 1, SESRSYN 2 and SESRSYN 3 all are in the same IED. If SESRSYN 3 is in
another IED, WA1 will be considered as WA2 and LINE2 as LINE1. The voltage is selected by activation
of different inputs in the voltage selection logic as shown in table
Table 22:
SESRSYN
SESRSYN 1
(Operates on
CB1 52)
SESRSYN 2
(Operates on
CB2 252)
SESRSYN 3
(Operates on
CB3 352)
Bay control REC670
Commissioning manual
Voltage selection logic
CBConfig
Section to
setting
be
synchronize
d
breaker-
Bus1 –
and-a-half
Line1
bus CB
Bus1 –
Line2
Bus1 –
Bus2
Tie CB
Line1 –
Line2
Bus1 –
Line2
Bus2 –
Line1
Bus1 –
Bus2
breaker-
Bus2 –
and-a-half
Line2
bus alt. CB
Bus2 –
(mirrored)
Line1
Bus2 –
Bus1
© 2017 - 2021 Hitachi Power Grids. All rights reserved
22
and figure 33.
Activated
Activated
Activated
B1QCLD
B2QCLD
LN1QCLD
input on IED
input on IED
input on IED
from
from
from
CB2 252
CB2 252
CB3 352
CB1 52
CB3 352
CB1 52
CB3 352
CB2 252
CB2 252
CB1 52
Testing functionality by secondary injection
GUID-12E7DA63-FE04-4C83-9BA6-34818C510DB8 v4
22
describes the
Activated
Indication
LN2QCLD
from
input on IED
SESRSYN
from
on IED
LN1 989
B1SEL,
LN1SEL
LN2 989
B1SEL,
LN2SEL
B1SEL,
B2SEL
LN1 989
LN2 989
LN1SEL,
LN2SEL
LN2 989
B1SEL,
LN2SEL
LN1 989
B2SEL,
LN1SEL
B1SEL,
B2SEL
LN2 989
B2SEL,
LN2SEL
LN1 989
B2SEL,
LN1SEL
B1SEL,
B2SEL
Section 11
M2377-691 v6
171

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents