ABB Relion 670 Series Commissioning Manual page 13

Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 511 403-UUS Rev. K
11.9.2.3
11.9.2.4
11.9.2.5
11.9.2.6
11.9.3
Fuse failure supervision ....................................................................................................... 161
11.9.3.1
11.9.4
Voltage based delta supervision DELVSPVC........................................................................162
11.9.4.1
11.9.4.2
11.9.5
Current based delta supervision DELISPVC(7I)................................................................... 163
11.9.5.1
11.9.5.2
11.9.6
Delta supervision of real input DELSPVC............................................................................. 164
11.9.6.1
11.9.6.2
11.10
Control.....................................................................................................................................165
11.10.1
11.10.1.1
11.10.1.2
11.10.1.3
11.10.1.4
11.10.1.5
11.10.2
Autorecloser for 1/2/3-phase operation SMBRREC (79).......................................................172
11.10.2.1
11.10.2.2
11.10.2.3
11.10.2.4
11.10.2.5
11.10.3
Apparatus control APC..........................................................................................................177
11.10.4
Function revision history........................................................................................................178
11.10.5
Voltage control TR1ATCC, TR8ATCC, TCMYLTC, TCLYLTC ..............................................178
11.10.5.1
11.10.5.2
11.10.5.3
11.10.5.4
11.10.5.5
11.10.5.6
11.10.5.7
11.10.5.8
11.10.5.9
11.10.6
Single command, 16 signals SINGLECMD........................................................................... 186
11.10.7
Interlocking............................................................................................................................ 186
11.11
Scheme communication.......................................................................................................... 187
Bay control REC670
Commissioning manual
Measuring the trip value for the zero-sequence function ................................................ 160
Measuring the trip value for the dead line detection function........................................... 160
Checking the operation of the dv/dt and di/dt based function ......................................... 161
Completing the test.......................................................................................................... 161
Completing the test.......................................................................................................... 162
Verifying the signals and settings..................................................................................... 162
Completing the test.......................................................................................................... 163
Verifying the signals and settings..................................................................................... 163
Completing the test.......................................................................................................... 164
Verifying the signals and settings..................................................................................... 164
Completing the test.......................................................................................................... 165
Testing the synchronizing function................................................................................... 167
Testing the synchrocheck functionality............................................................................. 167
Testing the energizing check............................................................................................ 169
Testing the voltage selection............................................................................................ 170
Completing the test.......................................................................................................... 172
Preparation of the verification ..........................................................................................174
Verifying the auto recloser ...............................................................................................175
Checking the auto reclosing conditions............................................................................176
Completing the test.......................................................................................................... 177
Secondary test................................................................................................................. 179
Check the activation of the voltage control operation.......................................................180
Check the normal voltage regulation function.................................................................. 180
Check the undervoltage block function............................................................................ 181
Check the upper and lower busbar voltage limit.............................................................. 181
Check the overcurrent block function............................................................................... 181
Single transformer............................................................................................................ 182
Parallel voltage regulation................................................................................................ 183
Completing the test.......................................................................................................... 186
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Table of contents
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents