Section 11
Testing functionality by secondary injection
CB1 52
(SESRSYN 1)
LN1 989
ANSI11000274 V1 EN-US
Figure 33:
11.10.1.5

Completing the test

Continue to test another function or end the test by changing the TESTMODE setting to Disabled.
Restore connections and settings to the original values, if changed for testing purposes.
11.10.2

Autorecloser for 1/2/3-phase operation SMBRREC (79)

Verification of the auto recloser for single-phase, two-phase or three-phase auto reclosing attempts can
be considered to consist of two parts.
One part to verify the internal logic and timing of the auto recloser
One part to verify its interaction with the protection system
This section deals with verification of the auto recloser itself. However, it is practical to initiate the auto
recloser by activating a protection function, for example, by secondary injection tests.
Prepare the IED for verification of settings outlined in Section
The purpose of verification before commissioning is to check that entered selections, setting and
configuration render the intended result. The auto recloser is flexible with many options and facilities. At
commissioning only the selections and settings intended for use are verified. If one chooses to reduce
some time settings in order to speed up verification, be careful to set the auto recloser at intended
operational values at the end of the verification procedure. One such parameter is the tReset time that
must be timed out before a new test sequence can be performed.
The verification test is performed together with protection and trip functions.
172
CB2 252
(SESRSYN 2)
Line 1
Objects used in the voltage selection logic
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Bus 1
Bus 2
CB3 352
(SESRSYN 3)
LN2 989
Line 2
ANSI11000274.en.v1
"Preparing the IED to verify
1MRK 511 403-UUS Rev. K
M2377-1042 v5
M12400-2 v12
settings".
Bay control REC670
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents