ABB Relion 670 Series Commissioning Manual page 179

Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 511 403-UUS Rev. K
Figure
34
external bi-stable relay (BR), for example a relay type RXMVB2 or RXMD or Breaker Simulator of Hitachi
Power grids. The following manual switches are used:
switch or push-button to close (SC)
switch or push-button to trip (ST)
switch for CB ready condition (SRY)
If no bi-stable relay or breaker simulator is available, replace it with two self-reset auxiliary relays and use
a self-holding connection.
Use a secondary injection IED test set to trip the protection function. The test set shall be switched off
when a trip signal is given or when the BR comes to open position to simulate real conditions.
The CB simulation can be made more elaborate, including simulation of the operating gear condition,
CBREADY of either the type ready for a Close-Open (CO) cycle, or the type ready for an Open-Close -
Open (OCO) cycle.
The CB condition CBREADY of a type, CO, shall be high (true) until a closing operation is performed. It
then goes low (false) for a recharging time of about 5 - 10s. After that it is high again.
A CB condition CBREADY of a type, OCO shall be high (true) before and during tripping (initiate auto
reclosing). During tripping it goes low for a recharging time, for example, 10s. It may thus be low at the
instant of reclosing. After each Open or Close operation it may need a recharging period before it goes
high again.
In the example of CB simulation arrangement, the CBREADY condition is simulated by a manual switch,
SRY.
Information and material for the verification:
Protection or control unit, IED, configured and with settings entered.
Configuration diagram for the IED
Terminal diagram for the IED, or plant circuit diagram including the IED
Technical reference manual for the IED
IED test set for secondary injection
Means to indicate, measure and record operation and times, for example an event recording facility
A bi-stable relay (BR) or two auxiliary relays to simulate a CB
Two push-buttons (SC, ST) to operate the BR and a change-over switch (SRY) to simulate
CBREADY
Possibly a switch simulation the synchronizing check SESRSYN (25) condition
Bay control REC670
Commissioning manual
illustrates a suggested testing arrangement, where the circuit-breaker (CB) is simulated by an
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Section 11
Testing functionality by secondary injection
173