ABB Relion 670 Series Commissioning Manual page 150

Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

Section 11
Testing functionality by secondary injection
Step no.
4-e**
4-f
4-g
4-h
- Steps 4–f, 4–g and 4–h can also be done phase wise.
* - UBase is considered as 400 kV and VT ratio as 400 kV/110 V
The voltage inputs U
phase L1.
** - This step should be done only during Factory Acceptance Test (FAT). At field, the testing should be
done with the stored field values.
To calculate PUDIFL1 in steps 4-f, 4-g and 4-h, use the following equations:
UDIFL
IECEQUATION19217 V1 EN-US
144
Changes after step 2
Activate binary input TRIGCOMP for 1 s
Inject U
= 23.04 V in secondary at rated
TapL1
frequency
Repeat
Inject U
= 22.31 V in secondary at rated
TapL1
frequency
Repeat
Inject U
= 21.83 V in secondary at rated
TapL1
frequency
, U
, and U
L1
L2
L3
1
1
U
U
L
1
TapL
USEDURATL
1
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Expected output
WARNING signal test
ALARM signal Test
Sub-step 4–a
and
Sub-step 4–b
TRIP Signal Test
Sub-step 4–a
and
Sub-step 4–b
refer to the bus voltages and U
1
1MRK 511 403-UUS Rev. K
The output COMPEXED
should become HIGH for
100 ms and LASTCOMP
output should display the
date and time of
compensation
URATIOL1 and
USEDURATL1 should
show 0.382
DIFURATL1 should
become LOW
WARNING and WRNL1
signals should become
HIGH after a time delay
given by the setting
tDefWrn
PUDIFL1 should show 5.03
%
ALARM and ALML1 signals
should become HIGH after
a time delay given by the
setting tDefAlm
PUDIFL1 should show
8.04%
BFI_3P and PU_A signals
should become HIGH after
a time delay given by the
setting tDefTrip
TRIP and TR_A signals
should become HIGH, if
BlockTrip is set to Trip
enabled
PUDIFL1 should show
10.01%
refers to the tap voltage of
TapL1
Bay control REC670
Commissioning manual
(Equation 31)