Installation Manual – BTS3606A Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
– A lot of cable installation positions are reserved in areas 3 and 4. You can lead in
the cable through the nearest sealing module.
– If no cable needs to be routed through the installation position reserved, you can
replace the common sealing module with the filler module.
– Never miss any module or install the wrong module.
– Use the remaining filler modules for pre-pressing the module.
III. Installation Procedure
Caution:
Waterproof components take effect 24 hours later after they are installed. Install
waterproof components in fine days to avoid water penetration.
Remove the rear door of the cabinet before installing waterproof components.
To install waterproof components, proceed as follows:
1)
Work out positions for cables according to the installation rule, and select modules
for cables to be installed.
2)
Unpack the module, rip off the outer plastic film, and remove the filling as shown in
Figure 5-25.
Figure 5-25 Removing the filling
3)
Remove core layers.
A maximum of two to three cables can be routed through a medium or small
module. Hence, estimate the number of core layers to be removed in advance.
Huawei Technologies Proprietary
5-24
Chapter 5 Installing Cables

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Airbridge bts3606a

Table of Contents