Huawei BTS3900 V200R010 Site Maintenance Manual

Wcdma
Table of Contents

Advertisement

Quick Links

BTS3900 WCDMA
V200
Site Maintenance Guide
Issue
07
Date
2009-08-30
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei BTS3900 V200R010

  • Page 1 BTS3900 WCDMA V200 Site Maintenance Guide Issue Date 2009-08-30 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 2 Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and service. For any assistance, please contact our local office or company headquarters. Huawei Technologies Co., Ltd. Address: Huawei Industrial Base Bantian, Longgang Shenzhen 518129 People's Republic of China Website: http://www.huawei.com...
  • Page 3: Table Of Contents

    5.8 Replacing the FAN Unit..........................5-12 5.9 Replacing the PMU............................5-15 5.10 Replacing a PSU............................5-17 5.11 Replacing a WRFU Module........................5-19 5.12 Replacing the Power Supply Subrack of the BTS3900................5-21 Issue 07 (2009-08-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 4 Figure 5-12 Installing the PSU...........................5-18 Figure 5-13 Position of the RFU........................5-20 Figure 5-14 Removing the RFU.........................5-20 Figure 5-15 Removing the PMU/PSU........................5-22 Figure 5-16 Removing the screws from the mounting ears................5-23 Issue 07 (2009-08-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 5 Table 4-1 Power switches on the DCDU-01 panel....................4-2 Table 4-2 Checklist for power supply to the components in the cabinet..............4-3 Table 4-3 Power switches on the DCDU-01 panel....................4-4 Issue 07 (2009-08-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 6: About This Document

    This describes the preparations for NodeB site maintenance. The preparations for site maintenance involve obtaining site information, selecting maintenance items, and arranging maintenance tools and spare parts. 3 Hardware Items of BTS3900 Routine Maintenance Issue 07 (2009-08-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 7 Normal paragraphs are in Times New Roman. Boldface Names of files, directories, folders, and users are in boldface. For example, log in as user root. Italic Book titles are in italics. Huawei Proprietary and Confidential Issue 07 (2009-08-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 8 Keyboard Operations The keyboard operations that may be found in this document are defined as follows. Format Description Press the key. For example, press Enter and press Tab. Issue 07 (2009-08-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 9 Press the primary mouse button twice continuously and quickly without moving the pointer. Drag Press and hold the primary mouse button and move the pointer to a certain position. Huawei Proprietary and Confidential Issue 07 (2009-08-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 10: Changes In The Bts3900 Wcdma Site Maintenance Guide

    This is the second commercial release. Compared with issue 02 (2009-6-30), the following parts are modified: The description is revised according to the changes of the cabinet structure. Issue 07 (2009-08-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 11 Compared with issue 01 (2008-03-30), the following parts are modified: The detail informations about replacing the board or module of the BBU3900 are added. 01 (2008-03-30) This is the initial field trial release. Huawei Proprietary and Confidential Issue 07 (2009-08-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 12: Preparations For Nodeb Site Maintenance

    Power test devices used to test and analyze the output power of the NodeB. A commonly used power test device, namely, a power meter. Issue 07 (2009-08-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 13 Rubidium clock (used to locate the clock of the NodeB) – Spare parts – NOTE When some parts are faulty and thus need to be replaced, arrange related tools and new parts for replacement. Huawei Proprietary and Confidential Issue 07 (2009-08-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 14: Hardware Items Of Bts3900 Routine Maintenance

    3.3 Maintenance of the Main Components in the BTS3900 This describes the maintenance items, maintenance interval, operating instruction, and reference standard of the main components in the BTS3900. Issue 07 (2009-08-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 15: Maintaining Items Of The Equipment Room Environment Of The Nodeb

    In addition, the pressure and period of validity of the extinguisher meet the requirement. There is no danger of damage to the equipment by rats or insects. Huawei Proprietary and Confidential Issue 07 (2009-08-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 16: Power Supply And Grounding System Maintenance Items Of The Nodeb

    The battery capacity is storage batteries batteries and rectifiers within the normal range every year. and the batteries are correctly connected. The performance parameters of rectifiers are normal. Issue 07 (2009-08-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 17: Maintenance Of The Main Components In The Bts3900

    If you are using a multimeter, the earth Use a multimeter to test the resistance is between earth resistance of the ESD 0.75 megohm and 10 wrist strap. megohms. Huawei Proprietary and Confidential Issue 07 (2009-08-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 18 BTS3900 WCDMA Site Maintenance Guide 3 Hardware Items of BTS3900 Routine Maintenance Issue 07 (2009-08-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 19: Powering On/Off The Bts3900

    BTS3900 in a normal situation such as moving the equipment or anticipating a territorial blackout. You must also power off the BTS3900 in an emergency such as a fire, smoke, or water immersion occurs in the equipment room. Issue 07 (2009-08-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 20: Powering On The Bts3900

    Table 4-1 Power switches on the DCDU-01 panel Module Power Switch SPARE2 Standby BBU SPARE1 RFU in slot 0 RFU0 RFU in slot 1 RFU1 RFU in slot 2 RFU2 Huawei Proprietary and Confidential Issue 07 (2009-08-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 21: Table 4-2 Checklist For Power Supply To The Components In The Cabinet

    RUN LED is steady green or blinks every other second. WBBP RUN LED is steady green or blinks every other second. RFU0 to RFU5 RUN LED is green and blinks every other second. Issue 07 (2009-08-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 22: Powering Off The Bts3900

    DCDU-01 panel. Figure 4-2 DCDU-01 panel Table 4-3 lists the power switches on the DCDU-01 panel. Table 4-3 Power switches on the DCDU-01 panel Module Power Switch SPARE2 Huawei Proprietary and Confidential Issue 07 (2009-08-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 23 Set the main power switch to OFF. Set all the DC power distribution switches on the DCDU-01 to OFF if time permits. ----End Issue 07 (2009-08-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 24: Replacing Components Of The Bts3900

    UBFA, the heat generated by the BBU cannot be properly ventilated and, with temperature increase, an overtemperature alarm is reported. The services, however, are not affected. 5.7 Replacing a DCDU-01 Module Issue 07 (2009-08-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 25 The power supply subrack is located in the lower cabinet of the BTS3900. It can be installed with the PSU and PMU to provide the power input and output ports. It takes about 25 minutes to replace the power supply subrack. Huawei Proprietary and Confidential Issue 07 (2009-08-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 26: Replacing A Bbu3900 Case

    After replacing the faulty BBU3900 case, check the following items: On the M2000 or LMT, the related alarms are cleared. A UE can access the cell carried by the BBU3900. Contact the local Huawei office to handle the faulty BBU3900 case. Issue 07 (2009-08-30) Huawei Proprietary and Confidential...
  • Page 27: Replacing A Wmpt

    Turn the ejector levers inwards, and then tighten the screws on the panel of the new WMPT. Connect the cables to the ports on the panel of the new WMPT according to the recorded cable connections. Huawei Proprietary and Confidential Issue 07 (2009-08-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 28: Replacing A Wbbp

    If the version is earlier than the version in the existing network, upgrade the software. ----End Postrequisite Record the bar code of the replaced board. Contact the local Huawei office to handle the faulty board or module. 5.3 Replacing a WBBP Replacing a WBBP disrupts all the services carried by the NodeB. Prerequisite The tools and materials, such as an ESD wrist strap or a pair of ESD gloves, Phillips screwdriver, ESD box or bag, dustfree cloth, and key to the cabinet door are ready.
  • Page 29: Replacing A Upeu

    Step 7 On the LMT, run the UBL BRD command to unblock the new WBBP. ----End Postrequisite Contact the local Huawei office to handle the faulty WBBP. 5.4 Replacing a UPEU The UPEU is the power module of the BBU and provides power for the boards in the BBU. The UPEU supports the -48/+24V V DC input.
  • Page 30: Replacing A Utrp

    For details on the LED of the UPEU, see the UPEU. ----End Postrequisite Contact the local Huawei office to handle the faulty UPEU. 5.5 Replacing a UTRP The UTRP is the BBU3900 main control and transmission board, replacing the UTRP disrupts all the services carried by the NodeB.
  • Page 31: Replacing A Ubfa

    For details on the LED of the UTRP, see the UTRP. ----End Postrequisite Contact the local Huawei office to handle the faulty board or module. 5.6 Replacing a UBFA The UBFA is the fan module in the BBU. The UBFA and the air inlet box in the BBU form a ventilation loop, implementing forced heat dissipation for the BBU.
  • Page 32: Figure 5-2 Loosening The Screws

    Step 1 Loosen the screws on the panel of the UBFA, as shown in Figure 5-2. Figure 5-2 Loosening the screws Step 2 Remove the faulty UBFA from the slot. Issue 07 (2009-08-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 33: Replacing A Dcdu-01 Module

    For details on the LED of the UBFA, see the UBFA. ----End Postrequisite Contact the local Huawei office to handle the faulty UBFA. 5.7 Replacing a DCDU-01 Module The DCDU-01, installed under the BBU, supplies DC power for the cabinet and has the function of surge protection.
  • Page 34: Figure 5-3 Removing The Protection Cover

    Step 8 Install the new DCDU-01 into the position where the original one is located, and then use the four removed M6x12 screws to fasten the DCDU-01 to the subrack. Issue 07 (2009-08-30) Huawei Proprietary and Confidential 5-11 Copyright © Huawei Technologies Co., Ltd.
  • Page 35: Replacing The Fan Unit

    Ensure that the related alarms are cleared on the M2000 or LMT after the equipment is powered on. Contact the local Huawei office to handle the faulty DCDU-01 module. 5.8 Replacing the FAN Unit The FAN unit works with the air inlet box in the cabinet to form a ventilation path. The FAN unit provides forced ventilation and dissipation for the BBU and RFU.
  • Page 36: Figure 5-5 Position Of The Fan Unit Switch

    Step 3 Loosen the captive screws on both sides of the adjustable cable trough. Then, raise the cable trough and fix it at the upper mounting hole, as shown in Figure 5-6. Issue 07 (2009-08-30) Huawei Proprietary and Confidential 5-13 Copyright © Huawei Technologies Co., Ltd.
  • Page 37: Figure 5-6 Raising The Adjustable Cable Trough

    Figure 5-6 Raising the adjustable cable trough (1) Upper mounting hole (2) Captive screw Step 4 Remove the four screws from the fan subrack, as shown in Figure 5-7. 5-14 Huawei Proprietary and Confidential Issue 07 (2009-08-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 38: Replacing The Pmu

    Ensure that the related alarms are cleared after the equipment is powered on. Contact the local Huawei office to dispose of the faulty FAN unit. 5.9 Replacing the PMU When the PMU is faulty and cannot be repaired in time, you must replace it.
  • Page 39: Figure 5-8 Removing The Pmu

    PMU from the slot, as shown in Figure 5-8. Figure 5-8 Removing the PMU Step 4 Set the DIP switch of the new PMU to 11000000, as shown in Figure 5-9. 5-16 Huawei Proprietary and Confidential Issue 07 (2009-08-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 40: Replacing A Psu

    The RUN LED on the panel blinks green at 0.5 Hz after the PMU is powered on. On the M2000 or LMT, the related alarms are cleared. Contact the local Huawei office to handle the faulty PMU. 5.10 Replacing a PSU When a PSU is faulty and cannot be repaired in time, you must replace it.
  • Page 41: Figure 5-11 Removing The Psu

    Step 4 Slide the PSU along the guide rails into the slot and then push the handle back. Step 5 Tighten the screws on the handle, as shown in Figure 5-12. Figure 5-12 Installing the PSU 5-18 Huawei Proprietary and Confidential Issue 07 (2009-08-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 42: Replacing A Wrfu Module

    The power LED on the PSU is ON (green) after the PSU is powered on. On the M2000 or LMT, the related alarms are cleared. Contact the local Huawei office to handle the faulty PSU. 5.11 Replacing a WRFU Module This describes how to replace WRFU.
  • Page 43: Figure 5-13 Position Of The Rfu

    Figure 5-14. Figure 5-14 Removing the RFU Step 6 Slide the new RFU along its guide rail until the module is in position (with obvious resistance). 5-20 Huawei Proprietary and Confidential Issue 07 (2009-08-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 44: Replacing The Power Supply Subrack Of The Bts3900

    On the M2000 or the LMT, the alarms related to the RFU module are cleared after the RFU module is powered on. Contact the local Huawei office to handle the faulty RFU module. 5.12 Replacing the Power Supply Subrack of the BTS3900 The power supply subrack is located in the lower cabinet of the BTS3900.
  • Page 45: Figure 5-15 Removing The Pmu/Psu

    ESD box. Step 6 Remove the four M6x12 strews on the two mounting ears of the power supply subrack, as shown Figure 5-16. 5-22 Huawei Proprietary and Confidential Issue 07 (2009-08-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 46: Figure 5-16 Removing The Screws From The Mounting Ears

    Check the cables and ensure that they are correctly and tightly connected. Ensure that the related alarms are cleared after the equipment is powered on. Contact the local Huawei office to handle the faulty power supply subrack. Issue 07 (2009-08-30)

This manual is also suitable for:

Bts3900 v200r011

Table of Contents