Casting Cement Plinth; Figure 2-5 Installation Position For A Battery Cabinet - Huawei Airbridge BTS3606 Installation Manual

Cdma base station cabinet installation
Hide thumbs Also See for Airbridge BTS3606:
Table of Contents

Advertisement

Installation Manual – BTS3606A Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
600mm (24in)
(1) Battery cabinet
(3) BTS3606A cabinet

Figure 2-5 Installation position for a battery cabinet

2.3.2 Casting Cement Plinth

This section introduces how to cast cement plinth in different situations.
I. Casting Cement Plinth for a Single Cabinet
Cast the cement plinth as shown in Figure 2-6. The height of the cement plinth must
meet the flood-protection requirement in local area. The plinth must be at least 100 mm
(4 in.) higher than the ground surface and protect the cabinet against water penetration
in the case of heavy rain or flood.
When casting the plinth, make sure that its level error is no more than 5 mm (0.2 in.).
Chapter 2 Installing Cabinet Base or Channel Steel
400mm (16in)
800mm (32in)
(2) Front of battery cabinet
(4) Wall or other reference objects
Huawei Technologies Proprietary
2-5