GE FVP110 Maintenance Manual page 66

Table of Contents

Advertisement

GE Energy
3. Place the FVP Rotary Mounting Bracket (#1) into place sliding it through the
anti-backlash spring (#14) into the dowel pin (3#) at the end of the plate into the hex
head screw installed in step 2.
4. Secure the plate to the bracket using four (4) M6 x 1.0 x16 socket head cap screws
(#6) and either:
Four (4) M8 x 1.25 x16 socket head cap screws (#12).
or
Four (4) M5 x 0.8 x16 socket head cap screws (#12).
FVP 110 Fieldbus Valve Positioner Manual
50

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents