Drive Belt Replacement And Adjustments; Replace The Drive Belt - GE T2100 Service Manual

Hide thumbs Also See for T2100:
Table of Contents

Advertisement

FRU Replacement
14.
Remove the 4 motor mounting bolts and carefully remove the motor.
NOTE:
15.
Swap motors and reassemble in reverse order following the note below when
installing the hub and flywheel.
NOTE:
16.
When the new drive motor is installed, adjust the drive belt tension and tracking.
See
page
17.
Calibrate the T2100 Treadmill. See

Drive Belt Replacement and Adjustments

Replace the Drive Belt

1.
Turn the ON/OFF switch to the OFF position, disconnect the power cord from the
wall outlet, and remove the shroud.
2.
Remove the front roller as described in
3.
Loosen the 4 motor mounting bolts and use the 2 drive belt adjustment bolts to
lower the motor and loosen the drive belt tension.
4.
Remove the old belt and replace with a new belt.
5.
Replace the front roller and adjust the drive belt tension. See
Tension" on page
116
The drive motor weighs 33 lbs. (15 k)
The flywheel is balanced and if installed 180° off will cause vibration when in
operation. Match up the mark on the flywheel with the mark on the hub for
the proper position of installation.
"Drive Belt Adjustments" on page 117
118.
117.
T2100 Treadmill
and
"Adjust Drive Belt Tracking" on
"Self-Calibration" on page
"Front Roller Replacement" on page
45.
108.
"Adjust Drive Belt
2021403-120F

Advertisement

Table of Contents
loading

Table of Contents