Check Installation - ABB ACH550-01 User Manual

Hide thumbs Also See for ACH550-01:
Table of Contents

Advertisement

ACH550-01 User's Manual

Check installation

The installation preparations have been com-
pleted according to the installation checklist.
The drive is mounted securely.
The space around the drive meets the drive's
specifications for cooling
location
The motor and driven equipment are ready for
start.
For IT systems, corner-grounded TN systems
and residual current circuit breakers: the inter-
nal EMC filter is disconnected
ing installation (R1...R4)
of wiring installation (R5...R6)
The drive is properly grounded.
The input power (mains) voltage matches the
drive's nominal input voltage.
The input power (mains) connections at U1, V1
and W1 are connected and tightened as speci-
fied.
The input power (mains) fuses and mains
switch are installed.
cable, fuses and circuit breakers
The motor connections at U2, V2 and W2 are
connected and tightened as specified.
The motor cable is routed away from other
cables.
NO power factor compensation capacitors are
in the motor cable.
The control connections are connected and
tightened as specified.
Installing the drive
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Check
on page 23).
(Input power (mains)
(Suitable mounting
(Overview of wir-
on page 43,
Overview
on page 44).
on page 401).
61

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ach550

Table of Contents