Mitsubishi Electric GOT1000 Series Connection Manual page 34

Microcomputers, modbus products, peripherals
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

(3) Setting [I/F]
The interface differs depending on the GOT to be used.
Set the I/F according to the connection and the position of communication unit to be mounted onto the GOT.
(a) GT16
3rd stage
2nd stage
1st stage
(Example: In the case of the GT1685)
(b) GT15
3rd stage
2nd stage
1st stage
(Example: In the case of the GT1575)
1 - 6
1. PREPARATORY PROCEDURES FOR MONITORING
1.1 Setting the Communication Interface
Extension interface 1
Extension interface 2
Standard interface 3
(RS-422/485 interface built in the GOT)
Standard interface 4
(Ethernet interface built in the GOT)
Standard interface 1
(RS-232 interface built in the GOT)
Standard interface 2
(USB interface built in the GOT)
Extension interface 1
Extension interface 2
Standard interface 1
(RS-232 interface built in the GOT)
Standard interface 2
(USB interface built in the GOT)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents