1. Anti-scalp roller
2. Pull link assembly
3. Pull link extension
4. Ball joint receiver
2. Make sure all tires are inflated to 8–12 psi.
6
Adjusting Carrier Frame
Rollers
No Parts Required
Procedure
1. Position the machine on a level surface and lower the
cutting unit carrier frames to the floor.
2. Verify that there is 1/2 in. (13 mm) clearance
between the carrier frame rollers and the floor.
3. If an adjustment is required, loosen the jam nut
on the carrier frame stop screw (Figure 10) and
rotate the screw up or down to raise or lower the
carrier frame. Tighten the jam nut after adjustment
is attained.
Figure 9
5. Washer (2)
6. Spacer
7. Nylon bushing (2)
1. Carrier frame roller
7
Optional Oil Cooler
No Parts Required
Procedure
If you are operating the machine in hot climates, where
ambient temperatures range from 70 degrees F (20
degrees C) to 120 degrees F (49 degrees C), or using it
for heavy-duty use (mowing other than greens, such as
fairways or verticutting), install a Hydraulic Oil Cooler
Kit, Part No. 104–7701, to the machine.
17
Figure 10
2. Carrier frame stop screw