Installing The Cutting Units; Models 04610 And 04611 Only) - Toro 04383 Operator's Manual

Traction unit
Hide thumbs Also See for 04383:
Table of Contents

Advertisement

8

Installing the Cutting Units

(For Cutting Unit Models 04610
and 04611 Only)
Parts needed for this procedure:
1
Offset Lift Hook
2
Bolts, M10–1.5
1
Gauge bar
1
Bolt (#10 x 5/8 inch)
1
Jam nut (#10)
3
Cutting unit
6
Washer
6
Ball stud
3
Grass Basket
Procedure
Note: When sharpening, setting the height-of-cut
or performing other maintenance procedures on the
cutting units, store the cutting unit reel motors in the
support tubes to prevent damage to the hoses.
Important: Do not raise the suspension to the
transport position when the reel motors are in the
holders in the machine frame. Damage to the
motors or hoses could result
Important: Whenever the cutting unit has to be
tipped to expose bedknife/reel, prop up rear of
cutting unit to make sure nuts on back end of
bedbar adjusting screws are not resting on work
surface (Figure 11).
1. Prop (not provided)
1. Remove the cutting units from the cartons. Assemble
and adjust them as listed in the cutting unit Operator's
Manual. Use the gauge bar from the loose parts kit
to adjust the height of cut.
2. Install the offset lift hook (Figure 12) to the top of
the cutting unit with (2) M10–1.5 bolts. Torque the
bolts to 25–30 ft–lbs. (34–40 N⋅m). The offset lift
hook should be positioned with hook forward.
1. Offset lift hook
3. All cutting units are shipped with the counter weight
mounted to the left end and the motor mount and
drive coupler mounted to the right end of the cutting
unit. To mount the cutting unit in the right front
position, proceed as follows:
18
Figure 11
2. Bedknife adjusting screw
nut (2)
Figure 12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greensmaster 3250-d

Table of Contents