Mounting The Front Carrier Frames; Adjusting The Carrier Frame Rollers - Toro Greensmaster 3250-D Operator's Manual

2-wheel drive traction unit
Hide thumbs Also See for Greensmaster 3250-D:
Table of Contents

Advertisement

5
Mounting the Front Carrier
Frames
Parts needed for this procedure:
2
Carrier frame
2
Spacer
2
Bolt (1/2 inch x 3-1/4 inches)
2
Locknut (1/2 inch)
Procedure
1.
Mount a carrier frame assembly to each clevis
with a spacer, bolt (1/2 x 3-1/4 inch), and locknut
(1/2 inch); refer to
N∙m (67 to 83 ft/lb).
1. Carrier frame
2. Spacer
3. Clevis
2.
Lubricate the bushings in each carrier frame with
No. 2 lithium grease.
Figure
8. Torque to 91 to 113
Figure 8
4. Bolt (1/2 x 3-1/4 inches)
5. Locknut (1/2 inch)
6
Adjusting the Carrier Frame
Rollers
No Parts Required
Procedure
1.
Position the machine on a level surface and
lower the cutting unit carrier frames to the floor.
2.
Verify that there is 13 mm (1/2 inch) clearance
between the carrier frame rollers and the floor.
3.
Ensure that the carrier frame rollers are level to
the ground. If they are not level, insert a long
tool into the end of the carrier frame and apply
pressure until the rollers are level.
4.
If you must adjust the clearance, loosen the
jam nut on the carrier frame stop screw
9) and rotate the screw up or down to raise or
lower the carrier frame. Tighten the jam nut to
secure the adjustment.
g016465
1. Carrier frame roller
13
Figure 9
2. Carrier frame stop screw
(Figure
g008412