Toro GreensPro 1200 Service Manual page 42

Hide thumbs Also See for GreensPro 1200:
Table of Contents

Advertisement

Installation
(Figures 21 through 23.)
1
7
6
5
Figure 21
1. Cap
2. Oil tank
3. Seal (2 used)
4. Adapter fitting (2 used)
1. Install drain plug (6) and seal (5).
2. Install adapter fittings (4) and seals (3). Tighten
adapter fittings to 26 ft-lb (35 N·m).
Hydraulic System
2
3
4
3
4
5. Seal
6. Drain plug
7. Decal
Page 4 - 18
8
9 10 11
Figure 22
3. Position oil tank assembly (8) on machine. Secure
tank to chassis using two cap screws (9), two lock nuts
(10), and four flat washers (11).
4. Remove plugs that were installed in hoses and
fittings during the removal process.
13
Figure 23
5. Using labels placed during removal, attach hoses
(12 and 13) to fittings on the oil tank. Tighten hose
swivel nuts to 24 ft-lb (32 N·m).
6. Fill oil tank with new oil. (Refer to Owner's Manual.)
7. Install
and
secure
Transmission Cover in the Service and Repairs section
of Chapter 5 - Chassis).
8. Lower and secure seat platform.
9. Operate machine. Check oil level and adjust if
necessary. Check components for leaks. Tighten any
loose connections.
9 10 11
12
transmission
cover
(see
GreensPro 1200

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents