Initial Server Setup - Cisco Catalyst 8300 Series Hardware Installation Manual

Edge ucpe
Hide thumbs Also See for Catalyst 8300 Series:
Table of Contents

Advertisement

Initial Server Setup

1
2
These are the steps to install the ground connection for the device. The ground lug kit is provided with the
chassis:
Before you begin
• Connect the chassis to the earth ground; the ground wire must be installed in accordance with local
• For grounding, use size 14 AWG copper wire and the ground lug provided in the accessory kit.
1. Strip one end of the ground wire to the length required for the groundlug.
2. Crimp the ground wire to the ground lug using a crimp tool of the appropriatesize (7/8" strip length).
3. Attach the ground lug to the chassis as shown in the figure. Use the screws provided along with the ground
lug to attach the lug to the device.
Initial Server Setup
Local Connection Procedure
• Ensure that the device is powered on.
• Connect serial console port on the front panel of the device.
• When you see the prompt, you can press F2 to get into the setup (BIOS) to change some settings.
• After you have performed the required configuration, save the setup and continue to boot.
For more information on initial server setup see, Hardware Installation Guide for Cisco Catalyst 8300 Series
Edge uCPE.
Cisco Catalyst 8300 Series Edge uCPE Hardware Installation Guide
26
electrical safety standards.
Install the Cisco Catalyst 8300 Series Edge uCPE
Ground lug
Screws

Advertisement

Table of Contents
loading

Table of Contents