Setting The Chassis On A Desktop; Setting Up The Chassis - Cisco AS5350XM Installation Manual

Cisco systems universal gateway chassis installation guide
Hide thumbs Also See for AS5350XM:
Table of Contents

Advertisement

Setting Up the Chassis

When installing or replacing the unit, the ground connection must always be made first and
Warning
disconnected last. Statement 1046
Warning
This unit is intended for installation in restricted access areas. A restricted access area can be
accessed only through the use of a special tool, lock and key, or other means of security.
Statement 1017

Setting the Chassis on a Desktop

The location of the chassis is extremely important for proper operation. Equipment placed too close
together, inadequate ventilation, and inaccessible panels can cause malfunctions and shutdowns, and can
make maintenance difficult. The following information will help you plan the location of the chassis:
Attaching the Rubber Feet
To attach the rubber feet to the chassis, follow this procedure:
Step 1
Carefully turn the chassis over so you can see the four small depressions made for attaching the rubber
feet. (See
gateway.
Remove the wax paper from the bottom of each rubber foot and press the foot into the small depression
Step 2
on the bottom of the chassis. (See
Cisco AS5350XM Universal Gateway Chassis Installation Guide
3-2
Plan for access to both front and rear panels of the chassis.
Ensure that the room where the chassis operates has adequate ventilation. Remember that electrical
equipment generates heat. Ambient air temperature may not cool equipment to acceptable operating
temperatures without adequate ventilation.
Figure
3-1.) The rubber feet are included in the accessory kit that shipped with your universal
Chapter 3
Figure
3-1.)
Installing the Cisco AS5350XM Universal Gateway
OL-6417-02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents