Locate the metal pins and the plastic studs on the underneath of the noninvasive blood pressure/
7
SpO
socket in the corresponding holes in the bus master board. Then replace the connector
2
block frame.
Remove the existing connector cover as described in step 6 for Option B71 on, then remove the
8
cover.
11 Upgrades
219