Site Preparation

2

Introduction

This section describes the procedures you should follow to plan and prepare a site for an Avalon
FM20/FM30 fetal monitor installation:

Site planning

Roles and responsibilities for local and Philips personnel
Site Planning
The careful planning of the site for the FM20/FM30 monitor is essential for its safe and efficient
operation. A consulting schedule should be established between the customer and Philips' sales and
support representatives to ensure that all preparations are completed when the system is delivered.
The site planning phases prior to equipment installation are:
Location: Planning the location of the various system components.
Environment: Confirming and correcting, as necessary, the environment of the proposed installation
site(s).
System Capabilities: Explaining the possibilities for system expansion.
Mounting: Referencing the mounting hardware information website for the listing of suitable
mounting hardware recommended for use with the various system components, and all details on the
available mounts and accessories.
Cabling: Identifying the requirements for the cabling, conduiting, and face plates for connecting the
various system components.
Roles and Responsibilities
This section describes the procedures necessary to prepare a site for a system installation. The
procedures are grouped into two parts: procedures that local staff or contractors are responsible for,
and procedures that Philips' personnel are responsible for.