GE H
RAFT
EALTHCARE
D
KTD102576, R
IRECTION
Section 7-3
Check Points Voltages
7-3-1
How to check power
7-3-1-1
RTN - Primary Power Supply (AC/AC)
Turn on mains switch and check green LED inside RTN.
7-3-1-2
RTP - Secondary Power Supply (AC/DC)
Power on the system and check the green LED inside the RTP.
NOTE:
If LED is on, RTP has full function (all voltages are within the specified range).
7-8
7
DRAFT (A
EVISION
Figure 7-8 check green LED inside RTN
Figure 7-9 check green LED inside RTP
Section 7-3 - Check Points Voltages
23, 2012)
UGUST
V
E8 / V
OLUSON
OLUSON
S
M
ERVICE
ANUAL
green LED inside RTN
green LED
inside RTP
E6