Preparation

The list below outlines the basic process of pre-
paring your machine for operation. Specific steps
are covered later in this section.
The typical preparation process is as follows:
1.
Unpack lathe/mill and inventory contents.
2.
Clean lathe/mill and its components.
3.
Identify an acceptable location for lathe/mill
and move it to that location.
4.
Mount lathe/mill on stand and bolt it to floor.
5.
Assemble loose components and make any
necessary adjustments or inspections to
ensure lathe/mill is ready for operation.
6.
Check lathe/mill for proper lubrication.
7.
Connect lathe/mill to power source.
8.
Test run lathe/mill to ensure it functions
properly.
9.
Perform spindle break-in procedure to pre-
pare lathe/mill for operation.

Unpacking

-18-

SECTION 3: SETUP

Needed for Setup

The following are needed to complete the setup
process, but are not included with your machine.
For Lifting and Moving:
— A forklift or other power lifting device rated
for at least 2000 lbs.
— Two lifting straps rated for at least 2000
lbs. each
— Lifting chain and safety hook rated for at
least 2000 lbs. each
— Another person to guide machine
For Power Connection:
— A power source that meets the minimum
circuit requirements for this machine
(review Power Supply on 16 for details)
— An electrician or qualified service person-
nel to ensure a safe and code-compliant
connection to the power source
For Assembly:
— Shop rags
— Cleaner/degreaser (see Page 20)
— Quality metal protectant lubricant
— Safety glasses for each person
— Anchoring hardware as needed (see
Page 25)
— Precision level at least 12" long
Model G0791 (Mfd. Since 9/15)