Section 5: Getting Started; System Requiring Up To 50 Watts Of Audio Power; System Requiring Up To 100 Watts Of Audio Power; System Requiring Greater Than 100 Watts Of Audio Power - Honeywell ECC-50/100 Instruction Manual

Emergency command center, multipurpose emergency voice evacuation panels
Table of Contents

Advertisement

This section describes the basic guidelines for setting up the various ECC-50/100 systems, assum-
ing that the speaker and FACP cabling has been installed.

5.1 System Requiring up to 50 Watts of Audio Power

1.
Install backbox and chassis assembly as described in Section 2, "Installation", on page 26.
2.
Connect laptop or PC to Ethernet port (J2) and launch the web-based programming utility.
3.
Configure the ECC-50/100 for Single Zone operation, if individual speaker circuit control is
not required. The factory default setting is Single Zone output control. Refer to Section 3,
"Programming", on page 59.
4.
Record any new voice messages as described in Section 4, "Operating Instructions", on page
84.

5.2 System Requiring Up to 100 Watts of Audio Power

1.
Install backbox, chassis assembly, and ECC-50W-25/70V and circuit boards as described in
Section 2, "Installation", on page 26.
2.
Connect laptop or PC to Ethernet port (J2) and launch the web-based programming utility.
3.
Configure the ECC-50/100 for Single Zone operation. Refer to Section 3, "Programming", on
page 59.
4.
Record any new voice messages as described in Section 4, "Operating Instructions", on page
84.

5.3 System Requiring Greater Than 100 Watts of Audio Power

1.
Install backbox and chassis assembly as described in Section 2, "Installation", on page 26.
2.
Connect the external Audio Riser and external Data Bus (for All-Call) cabling between the
ECC-50/100 and ECC-125DA and/or ECC-50DA panels.
3.
Connect laptop or PC to Ethernet port (J2) and launch the web-based programming utility.
4.
Configure the ECC-50/100 for Single Zone operation. Refer to Section 3, "Programming", on
page 59.
5.
Record any new voice messages as described in Section 4, "Operating Instructions" on page
84.
6.
Program the FACP to operate with the ECC-50/100 per the FACP manual.
– Enable the ACS-BUS serial link or ANN-BUS serial link.
– Assign audio zones where applicable (see Section 3.6, "Programmed Activation by FACP",
on page 76).
– Assign message numbers (1 - 5) where applicable (refer to Section 3.6, "Programmed
Activation by FACP", on page 76).
7.
Connect the external Audio Riser and ECC external Data Bus cabling between the ECC-
50/100 and the ECC-125DA and/or ECC-50DA.
94

Section 5: Getting Started

Emergency Command Center Manual — P/N LS10001-000FL-E:G 5/3/2016

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecc-50/100e

Table of Contents