Ecc-50/100 Panel Installation/Maintenance Security Checklist; Main Menu - User Programming - Honeywell ECC-50/100 Instruction Manual

Emergency command center, multipurpose emergency voice evacuation panels
Table of Contents

Advertisement

Programming
3.1 ECC-50/100 Panel Installation/Maintenance Security
Checklist
System Description:_____________________________________________________
System Location: _______________________________________________________
Installer: _______________________________________ Date: __________________
Complete the following security tasks for each ECC-50/100 installation.

Install the ECC-50/100 panel in a secure location considering both software and hardware vul-
nerabilities.

Change the default password to a unique password.
Securely configure networks and firewalls.

Assess security risks.
Develop a Disaster and Recovery Plan.

Develop a Backup and Recovery Strategy.
Install, configure, and maintain anti-virus software on all computers which access the panel.

Keep the operating system updated and maintain version compatibility with the panel.
Deliver all required system information upon delivery to the system owner.

Train end-users on security maintenance tasks upon system delivery.
For decommissioning, dispose of data securely.

Ensure the Ethernet cable is removed from the ECC-50/100 when not being utilized for config-
uration.

3.2 Main Menu - User Programming

This screen shows the main menu for the ECC user programming options. Changes to program-
ming require a valid password for system login. Note that a password is NOT required to change
the date/time, view the informational screens, or view the panel history.
60

ECC-50/100 Panel Installation/Maintenance Security Checklist

Figure 3.1 Main Menu
Emergency Command Center Manual — P/N LS10001-000FL-E:G 5/3/2016

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecc-50/100e

Table of Contents