Connecting The Cpu To The Load Power Supply - Siemens SIMATIC S7-1500 System Manual

Redundant system
Hide thumbs Also See for SIMATIC S7-1500:
Table of Contents

Advertisement

8. Retighten the screw (Figure 6). This effects a strain relief on the lines.
Figure 8-5
9. Insert the power connector into the module, until the latch engages.
Reference
You can find more information on connecting the 24 V DC output voltage of the load current
supply in the manuals for the relevant modules.
8.7

Connecting the CPU to the load power supply

Introduction
The load current supply is fitted with a plug-in 24 V DC output terminal (behind the front
cover at the bottom). You connect the cables for the supply voltage to the CPU at this
terminal.
Requirements
• Only wire the cable connector when the supply voltage is turned off.
• The connector for connecting the supply voltage to the CPU is already fitted. You can find
more information in the section Connecting the supply voltage (Page 266).
Tools required
3 to 3.5 mm screwdriver
Connecting the CPU to a load current supply
Watch the video sequence (https://support.industry.siemens.com/cs/ww/en/view/78027451)
S7-1500R/H redundant system
System Manual, 01/2024, A5E41814787-AF
Connecting the supply voltage to a system power supply/load current supply (2)
8.7 Connecting the CPU to the load power supply
Wiring
269

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic s7-1500r/h

Table of Contents