Siemens LMV5 Series Technical Instructions page 16

Linkageless burner management system
Hide thumbs Also See for LMV5 Series:
Table of Contents

Advertisement

Technical Instructions
Document No. LV5-1000
QRA75 Wiring Cable – Qty (1) Required per QRA75.A17 Flame Scanner
A pre-made 12 foot cable is required when using the QRA75 flame scanner. For more
information, refer to Document No. N7712.
AGM23U
Mounting accessories are available for both the forward viewing and side viewing QRI... flame
scanners. For more information, refer to Document No. N7719.
AGG2.110
AGG2.120
AGG90.U
LMV5-XPR-QRI
Section 1
Flame Scanner Accessories
Pre-made 12 foot cable for use with the QRA75...
flame scanner, supplied with 1/2" NPSM conduit
adapter.
QRI... Accessories - Optional
Kit for mounting forward viewing scanner
QRI2A2.B180B on a flame tube. Comes with clamp,
mounting sleeve, thermal barrier with 3/4" NPSM
connection, and heat insulation glass
Pg9 thread to 1/2" NPSM conduit connection
adapter for use with any QRI... flame scanner
Right angle adapter for mounting side viewing
scanner QRI2B2.B180B on a flame tube. Comes
with 3/4" NPSM female thread connection
Explosion proof housing for any QRI... flame scanner
Page 12
HOME
LMV Series
SCC Inc.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lmv51.140c1Lmv51.040c1Lmv52.240b1Lmv52.440b1

Table of Contents