Installing The Cutting Unit Lift-Arm Chains; Installing The Reel Motors - Toro Reelmaster 7000-D Operator's Manual

4-wheel drive traction unit
Hide thumbs Also See for Reelmaster 7000-D:
Table of Contents

Advertisement

Installing the Cutting Unit Lift-Arm Chains

Secure the lift-arm chain
with the snapper pin
Note:
in the cutting unit Operator's Manual.

Installing the Reel Motors

1. Grease the reel-motor spline shaft.
2. Oil the reel motor O-ring and install it onto the motor flange.
3. Install the motor
4. Rotate the motor counterclockwise until the flanges encircle the bolts, and then tighten
the bolts.
Ensure that the reel motor hoses are not twisted, kinked, or at risk of being pinched.
5. Torque the mounting bolts to 37 to 45 N∙m (27 to 33 ft-lb).
Setup: Installing the Cutting Units
to the chain bracket
.
Use the number of chain links described
by rotating it clockwise so that the motor flanges clear the bolts
G402673
G411002
IMPORTANT
Page 3–11
.
3466-706 A

Advertisement

Table of Contents
loading

This manual is also suitable for:

03781

Table of Contents