16 Checking After the Installation

For the items to be checked after installation, see "Room Presence Hardware and Cable
Connections" in the RP100 and RP200 Acceptance Test Guide.
To obtain this guide, visit http:www.huawei.com and search for RP100 and RP200 Acceptance
Test Guide.

17 Powering On the RP

Press the power button, which is located in the
1
lower right corner of the rack, to turn it ON.
2
(For RP-T only) Press the power button of
the VPT300.
After the RP has started, observe
3
TE30/VPC600/VPT300 and display status.
Model Name Status
The status indicator blinks green for several seconds. The LCD displays
TE30
a message indicating that the system is starting. After the system has
started, the camera rotates for several seconds and then stops rotating.
RP-S
The status indicator is steady red and the display says that the system is
Display
being started up. After a few seconds, the indicator is off. A boot
animation plays.
The status indicator blinks green for several seconds. The LCD displays
VPC60
a message indicating that the system is starting. After the system has
0
started, the camera rotates for several seconds and then stops rotating.
RP-A
The status indicator is steady red and the display says that the system is
Display
being started up. After a few seconds, the indicator is off. A boot
animation plays.
The status indicator blinks green for several seconds. The LCD displays
VPT30
a message indicating that the system is starting. After the system has
0
started, the camera rotates for several seconds and then stops rotating.
RP-T
The status indicator is steady red and the display says that the system is
being started up. After a few seconds, the indicator is off. A boot
Display
animation plays.
63
Power
button
Troubleshooting
Power off the RP
and check cable
connections by
referring to "Room
Presence
Hardware and
Cable
Connections" in the
RP100 and RP200
Acceptance Test
Guide.

Advertisement

Table of Contents
loading

Table of Contents