Pre-Maintenance Procedures; Preparing For Maintenance; Opening The Hood; Closing The Hood - Toro Reelmaster 5510 Operator's Manual

Traction unit
Hide thumbs Also See for Reelmaster 5510:
Table of Contents

Advertisement

Pre-Maintenance
Procedures

Preparing for Maintenance

1.
Park the machine on a level surface, disengage
the PTO, lower the cutting units, and engage
the parking brake.
2.
Shut off the engine, remove the key, and wait for
all moving parts to stop.
3.
Wait for the engine to cool.

Opening the Hood

1.
Release the 2 hood latches
Figure 60
1. Hood latch (2)
2.
Rotate open the hood.
(Figure
60).
g375764
44

Closing the Hood

1.
Carefully rotate the hood closed
Figure 61
1. Hood latch (2)
2.
Secure the hood with the 2 hood latches.

Opening the Screen

1.
Remove the ball pin from the screen latch
(Figure
62).
Figure 62
1. Ball pin
2.
Unlatch and open the screen.
(Figure
61).
g375759
g378822
2. Screen latch

Advertisement

Table of Contents
loading

This manual is also suitable for:

03964

Table of Contents