LUNA2000-2.0MWH-1H0, 2H0 Smart String ESS
User Manual
Procedure
Step 1 Determine the reference points for installing the ESS on the concrete platforms.
Mark the reference points using a marker.
Step 2 On the basis of the reference points, mark the mounting positions for the four
corner fittings of the ESS using an ink fountain and a long soft measure tape.
When marking the positions for corner fittings, ensure that the four lines form a
rectangle.
Figure 4-1 Concrete platform columns
Issue 02 (2021-11-15)
NO TICE
Copyright © Huawei Technologies Co., Ltd.
4 Installation
71