LUNA2000-2.0MWH-1H0, 2H0 Smart String ESS
User Manual
Figure 5-13 Removing the protective cover
Step 2 Remove the baffle plates for the signal cables.
Figure 5-14 Removing the baffle plates for the signal cables
Step 3 Connect the FE communications cables to the WAN ports on the CMU.
Issue 02 (2021-11-15)
Copyright © Huawei Technologies Co., Ltd.
5 Installing Cables
98