LUNA2000-2.0MWH-1H0, 2H0 Smart String ESS
User Manual
Figure 9-2 Power-off process of LUNA2000-2.0MWH-2H0
Proced
ure
1
2
3
4
5
6
Issue 02 (2021-11-15)
NO TE
Before powering off the system, shut down the entire system on the SmartLogger WebUI,
including the Smart PCS and the Smart Rack Controller.
Item
Powering
Powering off the AC side of
off the
the Smart PCS
Smart
Powering off the DC side
PCS
of the Smart PCS
Powering off the battery side of the DC
LV Panel
Powering
Switching off the DC circuit
off the
breakers of the rack in the
ESS
battery cabin
Switching off the DC circuit
breakers in the control unit
cabin
Powering off the secondary
devices (turning off the DC
switches and then the AC
switches)
Copyright © Huawei Technologies Co., Ltd.
9 Powering Off the System
Remarks
Corresponding to number 1
in the power-off flowchart
Corresponding to number 2
in the power-off flowchart
Corresponding to number 3
in the power-off flowchart
Corresponding to number 4
in the power-off flowchart
Corresponding to number 5
in the power-off flowchart
Corresponding to number 6
in the power-off flowchart
130