Figure 5-9 Removing the baffle plates for the AC input power cables
Step 3 Connect AC input power cables.
● The screw assembly whose model is subject to the delivery should be tightened
● Partially tighten the nuts of the AC input power cables to a torque of 5 N·m
● The wiring terminal must be installed with heat-shrink tubing at the crimping
● Lay out the AC input power cables according to the design, route the cable to
Figure 5-10 AC input power cable positions at the bottom
(1) DC power cable
hole
Issue 02 (2021-11-15)
NO TICE
according to the corresponding standard torque.
when securing the cables.
area of the cable conductor to ensure that the electrical clearance between the
conductors is greater than 20 mm.
the wiring positions on the corresponding switches, and label the cables.
(2) AC input power
cable or ground cable
hole
Copyright © Huawei Technologies Co., Ltd.
(3) Optical cable or FE
communications cable
hole
5 Installing Cables
(4) UPS or RS485 cable
hole (reserved)